- There was an increase in tuition this year.
- 2006/07 SDA $9,410.00
- 2007/08 SDA $10,730.00
- It is believed that this increase in tuition was associated with the
decrease in enrollment.
|
|
4
|
|
|
5
|
- The present enrollment is 243 students.
- The Freshman Class has and enrollment of 44 students, the lowest
enrollment of the four classes.
|
|
6
|
|
|
7
|
|
|
8
|
- A Spiritually Based, Strong Academic Environment.
- Christian Teachers, Instructors, and Friends
- An Emphasis on Discipline
|
|
9
|
- Prayer/Worship at the beginning of each class (average 4 classes daily)
- Daily Chapel (10-15 minutes)
- At least 2 Weeks of Prayer yearly
1 lead by students, and 1 local pastor
|
|
10
|
- 3 National Merit Minority Scholarship Semifinalists this year. (Scored
in top 5% of all minority students PSAT)
- This is a higher number then would be expected for the number of
minority students participating.
|
|
11
|
- Vocabulary
- Reading Comprehension
- Spelling
- Revising Written Materials
- Concepts and Problem Solving
- Computation
- Social Studies
- Science
- Sources of Information
- Critical Thinking
|
|
12
|
- Iowa Tests of Educational Development (ITED) Takoma Academy students by 4th
year have scored well above the mean.
The tests show a pattern of improved scholastic achievement year
by year.
- This test is given annually to nearly all high school students in the
state of Iowa, as well as a number of private school systems including
all SDA high school students.
|
|
13
|
|
|
14
|
|
|
15
|
|
|
16
|
- The Class of 2009 also exhibits a similar pattern of improved
performance, and an increased positive divergence from the mean
|
|
17
|
|
|
18
|
- install new fire doors in all hallways
- install new windows in all classroom & office areas
- install new drapery hardware & dress windows in all classrooms &
office areas
- purchase new piano for the chapel
- replace cafeteria tables & chairs
- recarpet all hallways & chapel
- replace chapel seats
- replace lockers
- update heating/cooling system for entire school with individual units
for separate sections of the building
- refurbish track area
- fence in the playing fields leaving track accessible for community use
- level & resod the playing fields
- install fence around property perimeter & gate at entrance
- update landscaping in all areas & finish courtyard garden
- restrict access to weight room with barrier to limit access when gym is
in use
- update/modify chapel lighting
- pave and stripe parking lot
- install median in driveway to force proper traffic flow
- refurbish tennis courts
- replace chapel & gym stage drapes
|
|
19
|
|
|
20
|
|
|
21
|
- To this point, with God’s help, we have raised $30,000 towards this
project. We have completed phase
one. Approximately $10,000 is
required to complete this project
|
|
22
|
- Voted to Keep the physical plant where it is presently, and to invest in
the present structure and grounds.
- Let us collectively get behind this decision, and find ways to ensure